1. Identify the correct statements regarding primary treatment of wastewaters:
Statement I: Primary treatment of wastewater typically aims for removal of dissolved organic matter.
Statement II: Primary treatment processes mainly rely of gravity settling for removal of solids.

a. Statement I is correct, while statement II is incorrect
b. Statement Il is correct, while statement I is incorrect
c. Both, statements I and Il are correct
d. Both, statements I and II are incorrect

Answer :- For Answers Click Here 

2. Which of the followings appear as appropriate velocity through screens:

a. 0.2 m/s
b. 0.8 m/s
c. 2.0 m/s
d. 5.0 m/s

Answer :- For Answers Click Here 

3. Gravel and cinders in the wastewater are typically removed in:

a. Grit Chamber
b. Bar Racks
c. Primary Sedimentation
d. Comminuting device

Answer :- For Answers Click Here 

4. Which of the following units are used for balancing variations in the flowrate and fluctuating pollutant load in the influent?

a. Screens
b. Gravity wells
c. Equalization tank
d. Sedimentation tank

Answer :- 

5. The real settling basins used for primary sedimentation usually have:

a. Discrete particle settling
b. Flocculent settling
c. Hindered settling
d. Compression settling

Answer :- 

6.

image 162
Answer :- For Answers Click Here 

7. As per CPHEEO, bottom slope in a rectangular settling basin is typically kept as:

a. 1 % towards inlet
b. 5 % towards center
c. 8 % towards outlet
d. 25 % towards sides

Answer :- 

8. For designing an ideal settling basin, overflow rate of settling basin is considered equal to the settling velocity of:

a. Smallest dia particle intended to be removed
b. Largest dia particle intended to be removed
c. Average dia particle intended to be removed
d. None of the above

Answer :- 

9. For treating 1 MLD wastewater, which of the following settling units would require least area, for the same settling efficiency?

a. Conventional Rectangular Settling Tank
b. Conventional Circular Settling Tank
c. Inclined Tube Settlers
d. Squire Settling Basin

Answer :- 

10. A spherical particle of dia 0.02 mm, and specific gravity 2.6 is settling in water of density 1000 kg/m’ and dynamic viscosity 1.002 × 10-3 Ns/m?. The terminal settling velocity of the particle would be:

a. 7 mm/s
b. 3.5 mm/s
c. 0.7 mm/s
d. 0.35 mm/s

Answer :- For Answers Click Here 

11. For ensuring head loss below 0.05 m, the maximum velocity through the bar screen having an approach velocity of 0.8 m/s should be:

a. 3.80 m/s
b. 2.27 m/s
c. 1.15 m/s
d. 0.64 m/s

Answer :- 

12. A 15 m long grit chamber is treating 12 MLD wastewater flow, with a flow through velocity of 0.25 m/s. The detention time for the grit chamber is:

a. 60 sec
b. 45 sec
c. 30 sec
d. 20 sec

Answer :- For Answers Click Here 

13. A 3.5 m deep circular sedimentation tank is treating 6000 m’/day wastewater flow at an overflow rate of 40 m/day. The approximate detention time of wastewater in the tank would be:

a. 3.0 hrs
b. 2.1 hrs
c. 1.6 hrs
d. 1.2 hrs

Answer :- 
image 163

14. The surface overflow rate of the tank is (in m3/hr/m2)

Answer :- 

15.

image 164
Answer :- For Answers Click Here 