NPTEL 5G Wireless Standard Design Week 12 Assignment Answers 2024

Sanket
By Sanket

NPTEL 5G Wireless Standard Design Week 12 Assignment Answers 2024

1. Which of the following parameters will the UE consider while reporting the rank indicator (RI) back to gNB.

  • Channel capacity
  • Number of antennas at gNB
  • The MCS in which the PDSCH is being transmitted by gNB
  • The MCS in which the UE needs to transmit the PUSCH signal
Answer :- For Answers Click Here 

2. Which of the following statements are true regarding the FR1 MIMO system

  • Users are multiplexed in frequency domain
  • The entire slot should be allocated to a single user
  • Orthogonality in time domain is achieved after taking IFFT
  • Each transmitter chain will require 2 DACs, and one downconverter
Answer :- For Answers Click Here 

3. Which factors differ in the system architecture between FR1 and FR2 MIMO systems?

  • The way in which different users are multiplexed
  • Number of antennas required to build a robust system
  • The way phase-shifting/ precoding is performed on the transmit symbols
  • The way in which the high-phy processing like TB-CRC calculation, code block segmentation, Encoding etc are done
Answer :- 

4. Which of the following statements are true regarding the synchronization signals.

  • Synchronization signals consists of PSS and SSS signals only
  • Synchronization signal will help the UE to find the slot boundary and symbol boundary
  • There PSS and SSS are used to calculate the system frame number
  • The synchronization signals are user specific
Answer :- 

5. Which of the following statements regarding PSS signals are true?

  • UE uses the frequency domain samples of the PSS sequence to perform synchronization
  • Slot boundary is determined by correlating the PSS sequence with the received signal
  • PSS is a 127 length sequence and there are about 336 different PSS sequences
  • PSS and SSS signals are present in the same slot
Answer :- For Answers Click Here 

6. Which of the following statements are incorrect regarding the initial access?

  • DL synchronization
  • SRS based channel sounding
  • CSI-RS based Rank Calculation
  • UL synchronization
Answer :- 

7. After completing synchronization using the SS signal, the UE would have estimated

  • Frequency offset
  • Symbol and frame boundaries
  • PDCCH CORESET information
  • Rank of the channel
Answer :- 

8. Which of the following statements are true regarding the FR2 system?

  • It supports the subcarrier spacing of 120kHz and 240kHz
  • It can support a maximum bandwidth of 200MHz
  • It operates in the mmWave frequency range of 24.25GHz to 52.6GHz
  • Cell sizes of FR2 system is same as that of FR1 system
Answer :- For Answers Click Here 
Share This Article
Leave a comment